I wanted to use the QueryDayFile tag to produce some output at the start of a month for the previous month. I don't need this creating/uploading in realtime or every 15 minutes so the End of Day option sounds best. However, that raises a question of exactly what end of day means, i.e. are the end of day extra web files created before the date rolls over or after. The value of MonN changes at midnight which obviously affects the data that's output.
To clarify what I mean, let's say it's the last day of November. At 23:59:59 Month-1 = October and 2 seconds later (00:00:01) Month-1 = November. So depending on when the end of day processing happens it could output October or November data.
If end of day means before Month changes then I can't create the previous month info until the end of the first day of the new month so most people wouldn't realistically see it until they wake up on day 2 of the month. If that's the case then I might need to generate some MySQL queries to extract the data I want, but that's a fair bit of extra work that I'd like to avoid if possible!
Welcome to the Cumulus Support forum.
Latest Cumulus MX V4 release 4.4.2 (build 4085) - 12 March 2025
Latest Cumulus MX V3 release 3.28.6 (build 3283) - 21 March 2024
Legacy Cumulus 1 release 1.9.4 (build 1099) - 28 November 2014
(a patch is available for 1.9.4 build 1099 that extends the date range of drop-down menus to 2030)
Download the Software (Cumulus MX / Cumulus 1 and other related items) from the Wiki
If you are posting a new Topic about an error or if you need help PLEASE read this first viewtopic.php?p=164080#p164080
Latest Cumulus MX V4 release 4.4.2 (build 4085) - 12 March 2025
Latest Cumulus MX V3 release 3.28.6 (build 3283) - 21 March 2024
Legacy Cumulus 1 release 1.9.4 (build 1099) - 28 November 2014
(a patch is available for 1.9.4 build 1099 that extends the date range of drop-down menus to 2030)
Download the Software (Cumulus MX / Cumulus 1 and other related items) from the Wiki
If you are posting a new Topic about an error or if you need help PLEASE read this first viewtopic.php?p=164080#p164080
QuerydayFile with End of Day processing
Moderator: mcrossley
-
packman2008
- Posts: 178
- Joined: Fri 30 Dec 2022 5:33 pm
- Weather Station: Davis VP2 + WLL
- Operating System: Windows 11
- Location: Blackpool, UK
- Contact:
QuerydayFile with End of Day processing
Last edited by packman2008 on Mon 25 Nov 2024 10:48 am, edited 1 time in total.
Chris
https://blackpool.weather-watch.com/
CMX 4.3.2b4067 ● CU 7.3.0b6 ● Davis VP2+WLL & Ecowitt GW1100 ● Core i5 Mini PC ● Windows 11 ● .Net 8.0.3
https://blackpool.weather-watch.com/
CMX 4.3.2b4067 ● CU 7.3.0b6 ● Davis VP2+WLL & Ecowitt GW1100 ● Core i5 Mini PC ● Windows 11 ● .Net 8.0.3
- mcrossley
- Posts: 14384
- Joined: Thu 07 Jan 2010 9:44 pm
- Weather Station: Davis VP2/WLL
- Operating System: Bullseye Lite rPi
- Location: Wilmslow, Cheshire, UK
- Contact:
Re: QuerydayFile with End of Day processing
Tasks flagged as end of day are called after the rollover processing is complete, ie the meteo date will be the 1st of the month, which I think is what you need?
-
packman2008
- Posts: 178
- Joined: Fri 30 Dec 2022 5:33 pm
- Weather Station: Davis VP2 + WLL
- Operating System: Windows 11
- Location: Blackpool, UK
- Contact:
Re: QuerydayFile with End of Day processing
Thanks Mark. That sounds like it's exactly what I need.
Chris
https://blackpool.weather-watch.com/
CMX 4.3.2b4067 ● CU 7.3.0b6 ● Davis VP2+WLL & Ecowitt GW1100 ● Core i5 Mini PC ● Windows 11 ● .Net 8.0.3
https://blackpool.weather-watch.com/
CMX 4.3.2b4067 ● CU 7.3.0b6 ● Davis VP2+WLL & Ecowitt GW1100 ● Core i5 Mini PC ● Windows 11 ● .Net 8.0.3